Task Lifecycle — Phase 3: Review & aggregate approval

Phase 3 of the task lifecycle, run by the jira-task-reviewer skill. Triggered from an issue's own worktree (branch-derived key, no key argument) after every leaf executor has reported back and transitioned its issue to <STATUS_IN_REVIEW>.

Scope is set by the worktree you stand in, and there are three entry shapes, not two. From the parent's worktree the reviewer handles both single-step top-level issues (no sub-tasks) and multistep parents (with sub-tasks): for single-step it reviews the one PR and posts a final report — no re-run needed (GitHub-for-Jira auto-transitions the issue to <STATUS_DONE> on merge); for multistep it reviews each sub-task PR, finds or creates the aggregate parent PR once sub-tasks are merged, and reviews that too. From a sub-task's own worktree it reviews that sub-task's PR and nothing else — no sibling, no parent PR, and no track determined; a full pass is then a separate run from the parent's worktree. The reviewer never merges anything — that remains the user's deliberate step. When a run approved anything, its last step (7) asks whether to move those issues to <STATUS_DONE> and transitions only what the user says yes to.

The diagram surfaces the two systems the reviewer drives as their own swimlanes — GIT (anything that mutates or reads repo/PR state: git fetch --prune, resolving the parent/base branches from the branch.<PARENT-BRANCH>.parentbranch git config that the assigner wrote in phase 1, the phase-check gh pr list, the per-PR 3a idempotency lookup, fetching PR diffs, gh pr review --comment --body-file with APPROVED — / CHANGES REQUESTED — body-prefix verdicts, and finding or creating the aggregate parent PR) and JIRA (anything that mutates issue state: fetching the parent + In-Review sub-tasks, reading fields.parent.key off a sub-task's own fetch to reach its parent, each rejected sub-task → In Progress transition, multi-line comments on the reviewed issue after every verdict, the per-sub-task summary comment on the parent, every report comment posted on the parent, and the step-7 user-approved → Done transitions) — so the full interaction reads User ↔ Reviewer ↔ GIT ↔ JIRA left to right.

Sequence diagram

What the diagram shows

  • Two tracks, three entry shapes, one skill — from the parent's worktree, step 1 determines the track from fields.subtasks: empty → single-step (the PR set is the one parent PR), non-empty → multistep (the PR set is each In Review sub-task PR). Each track walks its own branches from the same phase check. The third entry shape — a run from a sub-task's own worktree — determines no track at all: its PR set is that one sub-task's PR, and it never reaches the phase checks, step 4 or step 5. In all three the review-loop body (step 3, including its 3a idempotency check) is identical — only the PR set and the post-loop outcomes differ.
  • Participant routing — the reviewer orchestrates three parties. GIT owns repo/PR state: the opening fetch, resolving <PARENT-BRANCH> + <BASE_BRANCH> (the latter read from the parentbranch git config the assigner wrote in phase 1 — the phase-1 → phase-3 thread), the phase-check gh pr list, the per-PR 3a idempotency lookup, fetching PR diffs, the verdict comment (gh pr review --comment --body-file), and finding or creating the aggregate parent PR. JIRA owns issue state: fetching the parent + sub-tasks (filtering to <STATUS_IN_REVIEW>), climbing from a sub-task branch to its parent, each rejected sub-task → In Progress transition with its findings comment, and the summary/report comments posted on the parent after every review.
  • A sub-task branch does not climb into a full pass — the reviewer derives the key from the current branch (feature/-slug or hotfix/-slug) and jira.sh fetches that issue. A top-level issue with no sub-tasks follows the single-step track. If the issue is a Subtask, the run's scope stays that one sub-task's PR: fields.parent.key (already on the sub-task's own fetch) is read only to resolve <PARENT-BRANCH>, the base its PR targets, via pr_base.sh --parent-key. The parent is never re-fetched as an acting issue, fields.subtasks is never read, no track is determined, and the parent PR is never touched — that sweep belongs to a separate run from the parent's own worktree. Its walk is step 2 (for this one sub-task) → 3 → 6 → 7.
  • Phase check first, and track-aware — an explicit GIT gh pr list whose return dispatches the top-level branches. On the single-step track it has three outcomes: no PR → report that the executor hasn't opened one yet and exit (nothing to review); an open PR → the step-3 review loop; a merged PR → the S-MERGED report and exit. On the multistep track both the no parent PR and the open parent PR outcomes split further on the sub-task statuses, because neither state means what it looks like on its own: every sub-task <STATUS_DONE> → the merges have happened, so skip to step 5 (the only place the parent PR is ever created, and where 4a's "merge them manually, then re-run" lands); any sub-task not yet <STATUS_DONE> → the work is still in flight, so run the full step-2 pass and leave the parent PR to a later run. A merged parent PR → the M-FULLY-COMPLETE report and exit. Both phase checks also share two rules: several PRs back → act on the OPEN one (several open → ask which), and a CLOSED, unmerged PR matches no enumerated state, so stop and ask — someone abandoned that branch's PR deliberately, and both opening a replacement and reviewing a dead one would be guessing at intent. Every merged-state exit posts the step-6 report only — GitHub-for-Jira already handled <STATUS_DONE>, so there is no wrap-up to take and step 7 has nothing to offer.
  • The reviewer carries its own Jira identity on every call — there is no login step to run first. jira.sh / jira.ps1 authenticates per-request as --role reviewer, picking that role's email:token pair out of jira-sdlc-tools.local.env for the one call, so every canonical report and every reject-path transition below is attributed to the reviewer's Jira account. Nothing is stored and no account is "active", which is why a reviewer run can overlap a phase-2 executor run without either one displacing the other's credentials. Note this is the reviewer's Jira identity; its GitHub identity is a separate thing, and the one that matters for the idempotency check below. See plugins/jira-sdlc/skills/_shared/project-config.md and plugins/jira-sdlc/skills/_shared/jira-api-reference.md §9.
  • Idempotent review (step 3a) — before every PR review — the single-step PR, each multistep sub-task PR, and the aggregate parent PR (5b) — the reviewer checks whether its own GitHub identity already left a verdict comment (matched on author + body prefix, never on review state — both verdicts land as comments, so this identity leaves no review state to key on). The most recent verdict wins: a later one supersedes an earlier, which is what makes an approve→regression→reject sequence readable. Most recent APPROVED — → skip re-review and report the PR as already approved/awaiting merge, unless $ARGUMENTS asks for a re-review — that is the manual override for exactly this case. Most recent CHANGES REQUESTED — → a fresh re-review of the pushed fixes. This is the 3a idempotency node drawn in each review branch.
  • Empty exits and flag-and-skip (step 2) — the reviewer first discovers each In Review sub-task's branch (anchored git branch -a --list globs that also strip git's + marker for a branch checked out in another worktree) and its open PR. A sub-task with no branch or no open PR is flagged and skipped, not reviewed. If zero sub-tasks have an open PR, the run reports that there is nothing to review and exits before the review loop — except on the multistep track, where the phase check's split applies first: every sub-task <STATUS_DONE> means the PRs are merged and only the parent PR is missing, so the run goes to step 5 instead of exiting. Step 2 also runs on the sub-task-worktree path, for that one sub-task alone — it is the only place a branch becomes the prNumber that 3a needs.
  • Both verdicts go through --comment --body-file — in this plugin's default deployment the executor and reviewer share one gh account, and GitHub blocks an author from approving or requesting changes on their own PR. Both verdicts are recorded as review comments with the decision in their body prefix (APPROVED — … / CHANGES REQUESTED — …). The Jira transition to <STATUS_IN_PROGRESS> (reject path) is the actual workflow gate; the GitHub comment records findings and makes the verdict machine-detectable by the idempotency check (step 3a).
  • Single-step is one-and-done — on the single-step track, approval posts the final report immediately (S-APPROVED outcome, step 6), then step 7 offers to close the issue. Decline and GitHub-for-Jira auto-transitions it to <STATUS_DONE> when the user merges instead; either way no reviewer re-run is required. Only the S-CHANGES-REQUESTED outcome (reject) needs a re-run after fixes.
  • Single pass, no merge cascade — each In Review sub-task PR is reviewed in order, one at a time. The verdict happens immediately per-PR. There is no separate "batch merge" step; approved PRs are left for the human to merge manually, and rejected items keep the loop going so the full state is known. The only thing that stops the loop is running out of sub-task PRs.
  • Continue on rejection, don't stop — when a PR fails the review, the reviewer posts the CHANGES REQUESTED — verdict comment, transitions that issue back to <STATUS_IN_PROGRESS>, records it as blocked, and continues to the next sub-task. After every single PR (approved or rejected), a short summary comment is posted on the parent so the human can see progress in real time (intentional audit trail). The final report at the end (step 6) lists both approved and rejected items so the fix-and-re-run cycle is clear.
  • Parent PR: review, approve or reject, still never merge (multistep only) — once every sub-task PR is merged, the reviewer finds or creates the aggregate parent PR (GIT). If that PR is already CLOSED it stops and lets the user decide (5a) — it never reopens or recreates it. Otherwise it reviews the lighter aggregate diff (integration focus) and records a verdict on the parent PR via gh pr review --comment --body-file: approve → M-PARENT-READY (awaiting the human's manual merge), or request changes → M-PARENT-CHANGES-REQUESTED (integration file:line findings; fix on <PARENT-BRANCH> and re-run). Unlike a sub-task reject, the parent reject does not transition any Jira issue — the aggregate <PARENT-KEY> stays as-is. The reviewer never calls gh pr merge on the parent — merging into <BASE_BRANCH> is the human release decision. After the parent PR merges, no re-run is required; a re-run only reports the already-merged state (M-FULLY-COMPLETE).
  • No automatic status transitions — the reviewer never moves an issue to Done on its own. The only transition it performs unprompted is a rejected issue → In Progress, and only on a sub-task reject (3d) or a single-step reject (3d) — never on the multistep parent-PR reject (5b), where no executor will pick the parent branch up anyway.
  • Done is offered, never assumed (step 7) — the run's last step names every issue it approved and asks once whether to close them, moving only what the user confirms. It asks because an approval is not a merge: the reviewer never merges, so those PRs are still open, and on boards where Done means merged the card would be jumping ahead of the automation that really closes it. Boards that close at approval want the opposite, and nothing in the repo says which kind this project is. Declining (or a non-interactive run) leaves everything as-is and GitHub-for-Jira's merge automation closes the issues later. The already-merged exits (S-MERGED, M-FULLY-COMPLETE) skip the question — those issues are Done already. No extra Jira comment is posted either way: the step-6 report is still the run's single final comment.
  • Every terminal branch posts a JIRA report comment on the parent — per step 6, the report goes to chat and as a single Jira comment on <PARENT-KEY>: the single-step no-PR-yet exit, the single-step approve/reject (S-APPROVED / S-CHANGES-REQUESTED) and merged (S-MERGED) reports, the multistep nothing-to-review exit, the M-ALL-APPROVED and M-SOME-BLOCKED reports, the parent approve (M-PARENT-READY) and parent reject (M-PARENT-CHANGES-REQUESTED) reports, and the merged-state report (M-FULLY-COMPLETE). The one branch that stops without a step-6 report is the parent-PR-CLOSED case (5a) — it surfaces the state to the user in chat and waits for their decision.